bit of the new The metro road, which will connect Kabatas and Mahmutbey neighborhoods in Istanbul with a total of 19 stations were opened in transportation system on Monday with the audience of Officials from the Istanbul Metropolitan Municipality (IBB).
opening of Mecidiyekoy – Fulya – Yildiz road, which is 2 km (1.24 miles) long, was made Operating, starting from Mecidiyekoy and ending after two stations, in Existence of crowds of concerned citizens use The Road.
Istanbul Mayor Ekrem Imamoglu joined Opening ceremony, it is reported that IBB said “hello” to new year Through the inauguration of the Talimani Biological Wastewater Treatment Plant on January 1 Mecidiyeköy-Fulya-Yıldız metro line, opened for Services on Monday; And the Dudullu-Bostancı metro line, which will be open to citizens starting from on Jan 6.
IBB said that total investment cost of The three services amounted to 20 billion Turkish liras ($1.07 billion).
the total height of Kabataş-Mahmutbey line is 24.5 kilometers long. path that is formed of 19 stations, will have capacity of 70,000 passengers in one direction. way will pass across provinces of Beyoglu, Besiktas, Şişli, Kağıthane, Eyüp Sultan, Gazi Osman Pasha, Esenler, Bagcilar.
Kabataş Station will be integrated into Kabataş-Taksim-Funicular Road and Kabataş-Bağcılar Tramway. Yenikapı-Mecidiyeköy road will be also be integrated with the aforementioned route. the final would be the integration with Otogar-Bağcılar-Kirazlı-Basakşehir-Olympic metro route from Mahmutbey station.
bit of the new The metro road, which will connect Kabatas and Mahmutbey neighborhoods in Istanbul with a total of 19 stations were opened in transportation system on Monday with the audience of Officials from the Istanbul Metropolitan Municipality (IBB).
opening of Mecidiyekoy – Fulya – Yildiz road, which is 2 km (1.24 miles) long, was made Operating, starting from Mecidiyekoy and ending after two stations, in Existence of crowds of concerned citizens use The Road.
Istanbul Mayor Ekrem Imamoglu joined Opening ceremony, it is reported that IBB said “hello” to new year Through the inauguration of the Talimani Biological Wastewater Treatment Plant on January 1 Mecidiyeköy-Fulya-Yıldız metro line, opened for Services on Monday; And the Dudullu-Bostancı metro line, which will be open to citizens starting from on Jan 6.
IBB said that total investment cost of The three services amounted to 20 billion Turkish liras ($1.07 billion).
the total height of Kabataş-Mahmutbey line is 24.5 kilometers long. path that is formed of 19 stations, will have capacity of 70,000 passengers in one direction. way will pass across provinces of Beyoglu, Besiktas, Şişli, Kağıthane, Eyüp Sultan, Gazi Osman Pasha, Esenler, Bagcilar.
Kabataş Station will be integrated into Kabataş-Taksim-Funicular Road and Kabataş-Bağcılar Tramway. Yenikapı-Mecidiyeköy road will be also be integrated with the aforementioned route. the final would be the integration with Otogar-Bağcılar-Kirazlı-Basakşehir-Olympic metro route from Mahmutbey station.